Michigan panel wants details on Great Lakes oil tunnel plan

TRAVERSE CITY, Mich. (AP) – A Michigan regulatory panel wants more information on Enbridge Energy’s plan to drill an oil pipeline tunnel beneath a channel linking two of the Great Lakes. The state Public Service Commission delayed a decision Thursday on the Canadian company’s request for a permit to run a section of its Line 5 through the proposed tunnel. The commission says it doesn’t have enough details on tunnel engineering and safety risks. The  69-year-old pipeline carries oil through northern Michigan and Wisconsin to refineries in Sarnia, Ontario. One section crosses the bottom of the Straits of Mackinac between Lake Huron and Lake Michigan.

ReCENT POSTS

Loading...